Arbor Camp Low Pressure Sewer System – Ellsworth, Maine

The Solution

The project utilizes E/One Low Pressure Sewer (LPS) grinder pump stations installed at each individual unit. The full build-out will serve 17 structures including tree houses, tiny houses, and cabins. All pump stations are connected via a 2-inch force main that routes wastewater to a central treatment system. The project is currently under construction, with initial units already online and operational.

The use of small-diameter force mains allowed the piping network to follow the natural contours of the land, avoiding large-scale tree removal or landscape alteration. This approach directly supported the developer’s commitment to preserving as much of the natural landscape as possible throughout the construction process.

Results

The Arbor Camp project demonstrates how E/One low pressure sewer technology can enable sustainable development in sensitive natural environments. By utilizing individual grinder pump stations and small-diameter force mains, the development was able to expand its wastewater infrastructure without compromising the wooded character of the property that makes it a destination for guests.

As construction continues toward the full 17-unit build-out, the scalable nature of the LPS system allows additional units to be connected to the existing force main with minimal disruption. The result is a flexible, low-impact wastewater solution that grows with the development while protecting the natural landscape at every stage.

Download This Case Study