Case Study: FRMA Amphidrome® and EnBac™ Process

FRMA Amphidrome® and EnBac™ Process Provides Solution for Technically Challenging Total Organic Carbon (TOC)...

Case Study: Jennette’s Pier On-Site Wastewater Solution

Jennette’s Pier On-Site Wastewater SolutionNags Head, NCOriginally built in 1939, Jennette’s is the oldest...

Case Study: Crotched Mountain On-Site Wastewater Solution

Crotched Mountain On-Site Wastewater Solution Greenfield, NH The Crotched Mountain Foundation and Rehabilitation Center recently completed...

Case Study: Mashpee, Massachusetts – AMPHIDROME®

Low TN Limit Imposes Technical Challenge on MA On-Site Wastewater Solution Mashpee, Massachusetts Stantec Engineers...
Unison Solutions gas skid

Testimonial: Combined Heat and Power

The Oneida County Water Pollution Control Plant is utilizing the digester gas produced onsite in two...

Testimonial: Seepex Pumps at Wastewater Treatment Plant

Before… The city of Fulton, NY’s wastewater treatment plant had been using piston pumps for...

Testimonial: E/One Sewer Systems – First Installation in NY

43 YEARS LATER… The town of Cuyler, NY is the site...
Two Hydro-Dyne Great White Center Flow Screens at Watertown NY sewage treatment plant.

Testimonial: Hydro-Dyne Screens – Sewage Treatment Plant

PROBLEM: Watertown Sewage Treatment Plant The Watertown Sewage Treatment Plant was experiencing continual plugging of...
Hydro-Dyne Bull Shark Through Flow fine screen

Testimonial: Hydro-Dyne Through Flow Screen – Village of Mexico NY

PROBLEM: Village of Mexico, NY Public Works The Village of Mexico’s...

Testimonial: Gorman-Rupp Pump Station – Town of Farmington, NY

  645 Years of Pump Station Operation The Town of Farmington, New...