Project Case Studies

Projects at a Glance...

Pine Lake RV Resort – Sturbridge, Massachusetts

  • Project: On-Site Wastewater Solution
  • Client: Pine Lake RV Resort
  • Location: Sturbridge, MA
  • Scope of Work: Amphidrome® System
  • Description: Onsite Engineering was challenged by the Massachusetts Department of Environmental Protection (MassDEP) to design a system in compliance with current wastewater regulations by upgrading the previous septic systems to a decentralized on-site water resource recovery facility (WRRF) to provide the RV resort with a more enjoyable and immersive experience for its visitors.

Wastewater System – Sharon, Massachusetts

  • Project: Solution for Technically Challenging TOC Limit
  • Client: CHA Engineers
  • Location: Sharon, MA
  • Scope of Work: Amphidrome® and EnBac™ Process
  • Description: CHA Engineers was required by the Massachusetts DEP to design a 39,000 gpd treatment system with stringent TOC limits because it discharges treated wastewater into a drinking water Wellhead Protection Area.

Bridges At Mashpee – Mashpee, MA

  • Project: On-Site Wastewater Solution
  • Client: Epoch Assisted Living
  • Location: Mashpee, MA
  • Scope of Work: Amphidrome System
  • Description: Stantec Engineers was challenged by the Massachusetts Cape Cod Commission to design a nitrogen-reducing system with stringent limits for Epoch Assisted Living in Mashpee, MA.

Jennette’s Pier On-Site Wastewater Solution – Nags Head, NC

  • Project: On-Site Wastewater Solution
  • Client: Jennette’s Pier/ Department of Environmental and Natural Resources
  • Location: Nags Head, NC
  • Scope of Work: Amphidrome System
  • Description: Full wastewater treatment to remove BOD, TSS, nitrogen and phosphorus, and turbidity.

Crotched Mountain On-Site Wastewater Solution – Greenfield, NH

  • Project: On-Site Wastewater Solution
  • Client: Crotched Mountain On-Site Wastewater Solution
  • Location: Greenfield, NH
  • Scope of Work: Amphidrome System
  • Description: Full wastewater treatment to remove BOD, TSS, nitrogen and phosphorus and turbidity.
Happy Thanksgiving from Our Team! Please note that our offices will be closed starting at noon on Wednesday, November 26, and will reopen on Monday, December 1st. During this period, our emergency service lines will remain fully operational to assist with any urgent needs. We wish you and your loved ones a joyful Thanksgiving filled with warmth, rest, and memorable moments.
+