Description: Onsite Engineering was challenged by the Massachusetts Department of Environmental Protection (MassDEP) to design a system in compliance with current wastewater regulations by upgrading the previous septic systems to a decentralized on-site water resource recovery facility (WRRF) to provide the RV resort with a more enjoyable and immersive experience for its visitors.
Wastewater System – Sharon, Massachusetts
Project: Solution for Technically Challenging TOC Limit
Client: CHA Engineers
Location: Sharon, MA
Scope of Work: Amphidrome® and EnBac™ Process
Description: CHA Engineers was required by the Massachusetts DEP to design a 39,000 gpd treatment system with stringent TOC limits because it discharges treated wastewater into a drinking water Wellhead Protection Area.
Description: Stantec Engineers was challenged by the Massachusetts Cape Cod Commission to design a nitrogen-reducing system with stringent limits for Epoch Assisted Living in Mashpee, MA.
Happy Thanksgiving from Our Team! Please note that our offices will be closed starting at noon on Wednesday, November 26, and will reopen on Monday, December 1st. During this period, our emergency service lines will remain fully operational to assist with any urgent needs. We wish you and your loved ones a joyful Thanksgiving filled with warmth, rest, and memorable moments.