Project Case Studies

Projects at a Glance...

Wastewater System – Sharon, Massachusetts

  • Project: Solution for Technically Challenging TOC Limit
  • Client: CHA Engineers
  • Location: Sharon, MA
  • Scope of Work: Amphidrome® and EnBac™ Process
  • Description: CHA Engineers was required by the Massachusetts DEP to design a 39,000 gpd treatment system with stringent TOC limits because it discharges treated wastewater into a drinking water Wellhead Protection Area.

Bridges At Mashpee – Mashpee, MA

  • Project: On-Site Wastewater Solution
  • Client: Epoch Assisted Living
  • Location: Mashpee, MA
  • Scope of Work: Amphidrome System
  • Description: Stantec Engineers was challenged by the Massachusetts Cape Cod Commission to design a nitrogen-reducing system with stringent limits for Epoch Assisted Living in Mashpee, MA.

Jennette’s Pier On-Site Wastewater Solution – Nags Head, NC

  • Project: On-Site Wastewater Solution
  • Client: Jennette’s Pier/ Department of Environmental and Natural Resources
  • Location: Nags Head, NC
  • Scope of Work: Amphidrome System
  • Description: Full wastewater treatment to remove BOD, TSS, nitrogen and phosphorus, and turbidity.

Crotched Mountain On-Site Wastewater Solution – Greenfield, NH

  • Project: On-Site Wastewater Solution
  • Client: Crotched Mountain On-Site Wastewater Solution
  • Location: Greenfield, NH
  • Scope of Work: Amphidrome System
  • Description: Full wastewater treatment to remove BOD, TSS, nitrogen and phosphorus and turbidity.